
Long horizontal pulls, vertical pulls, 45° diagonals and short start-stop strokes. The foundation drill — consistent depth and speed along a dead-straight guide.
Practice
Eleven printable drill sheets for synthetic skin, each built around one skill: pulling a straight line, holding a curve, packing black, building a gradient. Every drill is drawn to fit the common 20 × 15 cm (about 8 × 6 in) practice skin, with corner marks to line the transfer up — one print, one blank.

warm-up
One sheet that touches every core skill: long pulls, circles, an S-curve, a gradient bar, packing squares and a stipple strip to copy. Run it at the start of every session.
The warm-up sheet runs a little of everything. Five minutes on it before real work tells you which skill is off that day.
Six sheets that take line control apart, from long straight pulls down to single-needle detail.

Long horizontal pulls, vertical pulls, 45° diagonals and short start-stop strokes. The foundation drill — consistent depth and speed along a dead-straight guide.

Circles from 1.4 in down to 0.3 in, open C-curves in both directions and long S-curves. Small circles are the honest test — any wobble shows.

Two spirals (one clockwise, one counter-clockwise), rows of script loops and zig-zags. Trains continuous curves and clean direction changes — the groundwork for lettering.

Straight and curved channels from 1 mm to 3 mm wide, plus taper channels. Pull a single pass with different liners and learn which grouping fills which channel.

Twelve simple outlines — circle, square, triangle, diamond, hexagon, star, heart, crescent, cross, arrow, teardrop and lightning bolt. Corners, points and closed curves in one sheet.

Tight parallels at 2 mm spacing, micro shapes under half an inch, single-needle dot rows and small script loops. For practising the delicate end of the trade.
Four sheets for solid packing, gradients, stipple and shading for form.

Bars, a centre-out band, an arc band and two circles, each marked with where solid black should fade to bare skin. Built for whip shading and smooth black-and-grey falloff.

Stippled reference shapes — a dense-to-sparse bar, a shaded sphere and an even 50% square — each beside an empty outline to reproduce. Copy the density, not the dots.

Squares in three sizes, a circle, a ring, a star, a crescent, a band with negative-space holes and a zig-zag band — all to pack solid black with no skin showing.

Sphere, cube, cylinder and cone, each with a light-direction arrow and a dashed line where the shadow begins. Shading that makes a shape look solid rather than flat.
There’s no official syllabus, but most apprentices are pushed through the skills in roughly this order, and for good reason — each one depends on the one before it.
Once the drills feel steady, move on to whole designs. Our tattoo practice stencils are real designs chosen for exactly that stage, ordered from simple geometric pieces up to stippled shading.
Ready for real designs? Try the tattoo practice stencils or the clean, forgiving beginner tattoo stencils — every design prints at true size with a calibration ruler on the sheet.